Day 322 — C++ literacy, closed book
Thursday, 24 June 2027 · Week 46 of 52 · Production · Catch-up day · 35 min
Light day. Week 46 was about being able to read and to reason rather than to build, and today checks that the claim you would make is one you can support.
What you should be able to do tonight
- State the latency numbers and the cache line argument from memory.
- Say honestly what you can and cannot do in C++, in the words you would use in an interview.
Tasks 35 min
20 min Finish anything outstanding from days 316 to 321. The C++ book verified against the Python one is the artifact worth having, because it is the concrete thing behind any claim you make.
15 min Closed book: the latency card, the cache line argument, the container crossover, and the four-way decomposition of your speedup. Then write the two sentences you would actually say when asked about C++.
Drill interview thread
Spaced repetition, not cramming. Every drill in the year is collected on the drills page.
Timed mixed set, seventh sitting: five problems in fifteen minutes. Score and plot.
A systems question: you need to store five years of tick data for 500 symbols and query arbitrary time ranges. Describe your storage design in two minutes, out loud, with the latency numbers behind each choice. This is a question with no single right answer and the reasoning is what is scored.
Market making, fourth sitting: I quote a market in a quantity you can estimate better than I can. Trade with me, then tell me what you learned from the fact that I was willing to trade at that price.
Resources
- cppreference — C and C++ standard library reference reference
- Jane Street — puzzles problems
Deliverable
The closed-book week 46 page, plus the two sentences you would say about your C++ ability.
Checkpoint
Give the latency numbers for cache, memory, SSD and a data centre round trip, then say what they imply for a tick store.
Prepare for tomorrow
Ten minutes tonight so Day 323, Friday, 25 June 2027 starts clean. This is what the evening email sends you.
Write out the steps your daily production run has to perform, in order, with the input and output of each.
There should be six or seven.
Note which ones can fail in a way that is not an exception.