Day 295 — The execution problem, stated as a trade-off you choose
Friday, 28 May 2027 · Week 43 of 52 · Microstructure · Study day · 60 min
Trading fast costs impact and trading slow costs risk, and the whole content of execution theory is that the balance between them depends on a preference you have to state rather than estimate.
What you should be able to do tonight
- State the Almgren-Chriss objective and identify which term is a cost and which is a risk preference.
- Say what happens to the optimal schedule as risk aversion goes to zero and to infinity.
Tasks 60 min
35 min Read the Almgren and Chriss problem setup and the derivation of the optimal trajectory as far as the closed form for linear impact. The objective is expected cost plus a risk aversion times the variance of cost, and the solution is an exponentially shaped schedule whose curvature is set by that aversion.
25 min Explore the two limits: with zero risk aversion the optimal schedule is a straight line, which is TWAP, and with infinite aversion it is an immediate trade. Implement the closed form and plot schedules across a range of aversions to see the family.
Resources
Deliverable
notebooks/day-295-almgren-chriss.ipynb with the optimal schedule family plotted across risk aversions and both limits identified.
Checkpoint
In the Almgren-Chriss objective, which term is a measured cost and which is a preference you chose?
Prepare for tomorrow
Ten minutes tonight so Day 296, Saturday, 29 May 2027 starts clean. This is what the evening email sends you.
Compute the expected cost and the standard deviation of cost for three of the schedules you plotted.
Plot the three points with cost on one axis and its standard deviation on the other.
You have drawn two points of a frontier. Tomorrow fills it in.