Day 262 — The term structure, and the surface as one object

Sunday, 25 April 2027 · Week 38 of 52 · Derivatives · Study day · 65 min

The comparison you made last night links the option market’s forward view directly to the volatility model you fitted in week 13, and the agreement or disagreement between them is tradeable information.

What you should be able to do tonight

  • Describe the implied volatility surface as a function of two variables and say what each slice means.
  • Compare the implied term structure against your own forecast term structure and interpret the gap.

Tasks 65 min

30 min Build the surface: implied volatility against log-moneyness and time to expiry, plotted as a surface and as a set of slices. Then convert to total implied variance, which is the coordinate in which the no-arbitrage conditions are cleanest and which tomorrow needs.

25 min Overlay your own forecast: your GARCH or HAR variance term structure from week 13 against the implied one, both annualised. The systematic gap between them is the variance risk premium, which week 40 measures properly. Note its sign and rough magnitude now.

10 min Note the practical problem: quotes exist only at listed strikes and expiries, so a surface is an interpolation, and every interpolation choice can create an arbitrage. That is tomorrow.

Resources

Deliverable

notebooks/day-262-surface.ipynb with the surface in total variance coordinates and the implied against forecast term structure overlaid.

Checkpoint

What does a slice of the surface at fixed maturity tell you, and what does a slice at fixed moneyness tell you?

Prepare for tomorrow

Ten minutes tonight so Day 263, Monday, 26 April 2027 starts clean. This is what the evening email sends you.

For your surface, check whether the call price is decreasing in strike and convex in strike at each expiry.

Then check whether total implied variance increases with maturity at each moneyness.

If any check fails, note where. Those are arbitrages or bad quotes.