Day 161 — Milestone: the research platform

Thursday, 14 January 2027 · Week 23 of 52 · The research harness · Milestone · 50 min

Milestone — The research platform. What makes it good

The most valuable artifact of the year and the one an interviewer will ask most about, because it is the part of the work that cannot be faked in a slide.

What you should be able to do tonight

  • Have someone able to clone the repository, run one command, and reproduce a result you report elsewhere.
  • Present the list of remaining lies as the strongest section of the document rather than as an apology.

Tasks 50 min

30 min Finish reports/milestone-05-platform.md: the event-driven architecture with the read-decide-order-fill-mark sequence, the cost model with components separated and the net-Sharpe-against-cost chart, the test suite described test by test with what each one catches, and the ranked list of lies with dispositions.

20 min Verify by doing it: clone your own repository into a fresh directory, install from the lockfile, run the one command, and check the number matches. Anything that fails here is a defect the document would otherwise have claimed away.

Drill interview thread

Spaced repetition, not cramming. Every drill in the year is collected on the drills page.

Arithmetic, timed, twenty-third sitting. Ten two-digit multiplications, the sevenths, and 8 percent of 1,250 plus 12 percent of 3,400 in your head.

Random walks and stopping, combined: a symmetric random walk starts at 0 and you stop when you first hit plus 3 or minus 5. Probability of each, expected duration, and then the same for a walk with steps of plus 2 and minus 1 with equal probability.

Halfway through the drill thread’s second band. Write down the three problem types that are still slowest and compare against your day 91 list.

The running strategy

Milestone 5 closes the harness. The event loop, the fill model, the cost breakdown, the point-in-time store and the test suite are the platform every signal in phase 6 runs through, unchanged.

Resources

Deliverable

reports/milestone-05-platform.md, complete, verified by a clean clone reproducing a reported result with one command.

Checkpoint

Describe your test suite in ninety seconds, saying what each test catches and which one you are proudest of.

Prepare for tomorrow

Ten minutes tonight so Day 162, Friday, 15 January 2027 starts clean. This is what the evening email sends you.

Write down what you think the word signal means, precisely enough to code it. It is harder than it sounds.

List three quantities you have already built that could be signals.

One paragraph. Phase 6 starts from your definition and improves it.